CSS/CSOS Concealed-Head Standoffs

PEM CSS/CSOS Concealed-Head Standoffs ensure permanent mounting in metal sheets as thin as 0.062". These standoffs feature a fastener head that is locked securely in a blind milled hole and is built to withstand substantial loads. The concealed-head feature allows the side of the sheet opposite installation to remain smooth, ensuring secure placement without gaps or breaks. Little sheet preparation is required with these standoffs. Users can mill a blind hole to the recommended minimum depth, install the concealed-head standoffs using a hollow anvil and solid punch, place the head of the fastener in the hole, and insert using any standard press. PEM CSS/CSOS Stainless Steel Standoffs are suitable for various markets, including automotive, datacom, electric vehicles, medical, and industrial.

Risultati: 136
Seleziona Immagine Codice Produttore Descrizione Scheda dati Disponibilità Prezzi (CHF) Filtra i risultati nella tabella per prezzo unitario in base alla quantità. Qtà RoHS Modello ECAD Prodotto Tipo Dimensione del filetto Lunghezza Materiale Placcatura Genere
PEM Distanziali STANDOFF,CONCEALED,STAINLESS 2 361A magazzino
1.10 CHF
0.856 CHF
0.783 CHF
0.737 CHF
Min: 1
Mult.: 1
Standoffs Self Retaining M3 0.25 in
PEM Distanziali STANDOFF,CONCEALED,STAINLESS 8 658A magazzino
1.08 CHF
0.831 CHF
0.762 CHF
0.717 CHF
Min: 1
Mult.: 1
Standoffs Self Retaining M3 0.375 in Stainless Steel Zinc Male
PEM Distanziali STANDOFF,CONCEALED,STAINLESS 849A magazzino
1.33 CHF
1.01 CHF
0.931 CHF
0.872 CHF
Min: 1
Mult.: 1
Standoffs Self Retaining M3 0.625 in Stainless Steel Male
PEM Distanziali STANDOFF,CONCEALED,STAINLESS 1 484A magazzino
1.39 CHF
1.06 CHF
0.964 CHF
0.914 CHF
Min: 1
Mult.: 1
Standoffs Self Retaining M3 0.75 in Stainless Steel Male
PEM Distanziali STANDOFF,CONCEALED,STAINLESS 315A magazzino
1.05 CHF
0.808 CHF
0.74 CHF
0.696 CHF
Min: 1
Mult.: 1
Standoffs Self Retaining 4-40 0.25 in Stainless Steel Zinc Male
PEM Distanziali STANDOFF, CONCEALED, STAINLESS 483A magazzino
1.16 CHF
0.906 CHF
0.827 CHF
0.778 CHF
Min: 1
Mult.: 1
Standoffs Self Clinching 4-40 6.4 mm Stainless Steel
PEM Distanziali STANDOFF, CONCEALED, STAINLESS 256A magazzino
2.68 CHF
2.13 CHF
1.97 CHF
1.86 CHF
Min: 1
Mult.: 1
Standoffs Self Retaining 8-32 25.4 mm Stainless Steel
PEM Distanziali STANDOFF, CONCEALED, STAINLESS 1 692A magazzino
1.25 CHF
0.973 CHF
0.889 CHF
0.84 CHF
Min: 1
Mult.: 1
Standoffs Self Retaining M3 6 mm Stainless Steel
PEM Distanziali STANDOFF,CONCEALED,STAINLESS 673A magazzino
0.923 CHF
0.708 CHF
0.657 CHF
0.622 CHF
Min: 1
Mult.: 1
Standoffs Self Retaining 4-40 Stainless Steel Zinc Male
PEM Distanziali STANDOFF,CONCEALED,STAINLESS
1 99021.12.2026 previsto
1.18 CHF
0.914 CHF
0.84 CHF
0.789 CHF
Min: 1
Mult.: 1
Standoffs Self Retaining M3 0.5 in Stainless Steel Zinc Male
PEM Distanziali STANDOFF,CONCEALED,STAINLESS 10 000Disponibile a magazzino presso produttore
0.535 CHF
Min: 10 000
Mult.: 5 000
Standoffs Self Retaining 6-32
PEM Distanziali STANDOFF, CONCEALED, STAINLESS Tempo di consegna, se non a magazzino 10 settimane
1.37 CHF
Min: 10 000
Mult.: 5 000
Standoffs Self Retaining M6 6 mm Stainless Steel
PEM Distanziali Tempo di consegna, se non a magazzino 13 settimane
1.61 CHF
Min: 10 000
Mult.: 5 000
Standoffs 10-32 0.625 in
PEM Distanziali Tempo di consegna, se non a magazzino 13 settimane
1.73 CHF
Min: 10 000
Mult.: 5 000
Standoffs 10-32 0.75 in
PEM Distanziali Tempo di consegna, se non a magazzino 13 settimane
1.97 CHF
Min: 10 000
Mult.: 5 000
Standoffs 10-32 1 in
PEM Distanziali Tempo di consegna, se non a magazzino 13 settimane
1.23 CHF
Min: 10 000
Mult.: 5 000
Standoffs 10-32
PEM Distanziali Tempo di consegna, se non a magazzino 13 settimane
1.32 CHF
Min: 10 000
Mult.: 5 000
Standoffs 10-32 0.25 in
PEM Distanziali Tempo di consegna, se non a magazzino 13 settimane
1.38 CHF
Min: 10 000
Mult.: 5 000
Standoffs 10-32
PEM Distanziali STANDOFF, CONCEALED, STAINLESS Tempo di consegna, se non a magazzino 13 settimane
1.45 CHF
Min: 10 000
Mult.: 5 000
Standoffs Self Retaining 10-32 9.5 mm Stainless Steel
PEM Distanziali Tempo di consegna, se non a magazzino 13 settimane
1.53 CHF
Min: 10 000
Mult.: 5 000
Standoffs 10-32 0.5 in
PEM Distanziali Tempo di consegna, se non a magazzino 13 settimane
1.71 CHF
Min: 10 000
Mult.: 5 000
Standoffs 1/4-20 0.625 in
PEM Distanziali Tempo di consegna, se non a magazzino 13 settimane
2.12 CHF
Min: 10 000
Mult.: 5 000
Standoffs 1/4-20 0.75 in
PEM Distanziali STANDOFF, CONCEALED, STAINLESS Tempo di consegna, se non a magazzino 13 settimane
2.42 CHF
Min: 10 000
Mult.: 5 000
Standoffs Self Retaining 1/4-20 25.4 mm Stainless Steel
PEM Distanziali Tempo di consegna, se non a magazzino 13 settimane
1.32 CHF
Min: 10 000
Mult.: 5 000
Standoffs 1/4-20
PEM Distanziali Tempo di consegna, se non a magazzino 13 settimane
1.38 CHF
Min: 10 000
Mult.: 5 000
Standoffs 1/4-20 0.25 in